USD11,994.100.06%EUR13,420.200.20%RUB145.790.34%
News

ATM Assembly in Uzbekistan: What It Means for Suppliers

The President ordered a study on local ATM production, EV chargers, and server cooling systems. Here's who benefits and how to prepare.

TenderLabs team3 min read

What happened

President Shavkat Mirziyoyev ordered a study on the possibility of producing ATMs in Uzbekistan. Spot.uz reported this, citing a meeting with electrical industry representatives. Besides ATMs, the production of EV chargers in Jizzakh and server cooling systems in Karakalpakstan was discussed. Context: over ten years, electrical equipment output grew almost 30 times, exports 14 times, but the sector still depends on imports of high-tech products. According to Daryo.uz, last year Uzbekistan imported 9,000 ATMs worth over $50 million, and demand will grow with new shopping centers and residential areas.

This is a study order, not an approved program. But the signal is clear: the state wants to replace imported ATMs and related equipment with local assembly. For suppliers, this means requests for components, parts, and services to set up such production may appear in the coming months.

What it means for suppliers

Several groups can benefit. First, manufacturers and suppliers of electronic components: payment modules, card readers, dispensers, touch screens, casings. Second, companies doing assembly and contract manufacturing of electronics: if the project moves forward, they'll need a site, equipment, and staff. Third, suppliers of cooling systems, power supplies, and surge protection: ATMs need stable operation in unheated rooms and outdoors. Fourth, service and logistics companies that will maintain the equipment fleet.

Also watch EV chargers in Jizzakh and server cooling systems in Karakalpakstan. These are specific regions and products, not abstract plans. If production starts, tenders for equipment, installation, and components will appear at the regional level.

When to expect procurement? The order has just been given, so first official tenders may not appear immediately — first the feasibility study, then a decision, then design and procurement. But prepare in advance: you have time to gather documents and find partners.

According to TenderLabs, as of November 9, 2026, there are 917 open lots in the "Equipment and Machinery" sector. This shows procurement in related niches is active, and your task is to be among suppliers when specific requests appear.

What to do now

  1. 1Check if you have components for ATMs, EV chargers, or cooling systems in your product range or production capabilities. Make a list of what you can actually supply.
  1. 1Prepare a document package for tenders: proof of experience, certificates of conformity, financial statements. If you plan to supply imported components, check import terms and conditions.
  1. 1Find potential partners among local electronics assemblers and casing manufacturers. A joint bid often looks stronger than a solo one.
  1. 1Set up procurement monitoring in TenderLabs by keywords: "ATM", "EV charger", "cooling system", "electrical equipment". Don't wait for the announcement to appear on general platforms.
  1. 1If you have production capacity, think about how you can offer yourself as a contract manufacturer. At an early stage, such offers often find a recipient faster than participating in a ready tender.

TenderLabs helps you track relevant tenders and stay ahead. Use it to monitor keywords and get alerts.

Photo: Spot.uz

All news

More news