Qualification Requirements in Tenders: How a Small Company Can Pass Selection
We break down what is checked during selection: experience, licenses, turnover. How a small company can prepare documents and avoid being rejected due to formalities.

What is checked during selection and why small companies fail
Qualification selection is a formal check: do you meet the requirements or not. Winning the competition does not matter if you fail this filter. Experience, licenses, and financial indicators are checked against documents. An error in a certificate or an expired license means your bid is rejected.
According to TenderLabs data, as of October 29, 2026, there are 5,758 lots open in the system. In the last week, 10,282 new ones were added; over 30 days, 27,565. Competition is high, but many bids are filtered out before the proposal is evaluated. Most often due to non-compliance with qualification requirements.
Experience: how to show you have done similar work
The buyer wants to see confirmation that you have performed similar work. Usually they ask for contracts from the last 2–3 years. Copies of contracts and completion certificates are attached as proof.
A small company does not need dozens of contracts. One or two similar ones are enough. If you have little experience, show comparable work: different scale but the same essence. For example, you supplied equipment for a small workshop — this may count as an analogue for supplying a larger facility.
Check that the contracts show the parties, subject, and amount. The certificate must be signed. If a contract was terminated, it is better not to include it in the list: the buyer may request the history.
Licenses and permits: what must be valid on the submission date
License requirements depend on the type of work. Sometimes a license is needed, sometimes a certificate or permit. Check the exact list in the announcement: it can vary from procurement to procurement.
Check the expiration date. If the license expires in a month and the contract is for a year, the buyer may reject the bid. Some activities do not require a license, but the buyer has the right to request confirmation that it is not required.
Do not attach extra documents "just in case." This increases the risk of error. Better to follow the list in the announcement strictly.
Financial turnover: how a small company can meet the requirement
Buyers often set a minimum annual turnover. Usually it is tied to the contract amount. Look for the specific figure in the qualification requirements. There is no universal threshold: each procurement has its own.
If your turnover is below the required amount, do not rush to give up. Sometimes the buyer allows confirming financial solvency in other ways: a bank certificate, guarantee, or surety. Read the terms carefully.
A turnover certificate is usually prepared by the accounting department based on reporting data. Check that the figures match the tax reporting. Discrepancies raise questions.
Common mistakes and how to avoid them
- 1Expired documents. Check the dates on all certificates and licenses. Even one day of delay can cause rejection.
- 2Incomplete package. If the announcement lists documents, attach all of them. Missing one certificate means a rejected bid.
- 3Mismatched experience. Do not list contracts that are not similar to the procurement subject. The buyer will see it.
- 4Errors in details. Verify the tax ID, company name, and address against the registration documents.
- 5Ignoring clarifications. If a requirement is unclear, ask a question through the platform. The answer is published officially and is binding for the buyer.
How to prepare in advance and pass selection more calmly
Gather a basic package of documents: charter, registration certificate, certificates of no debt, licenses, list of contracts with certificates. Keep them in one place and up to date.
Check the validity of licenses and certificates once a quarter. Renew what will expire soon in advance. This is cheaper than missing a profitable tender.
Before submitting, go through the checklist from the announcement. Tick each item. If something is missing, assess whether you can obtain the document before the deadline. Sometimes it is easier to skip the procurement than to spend time on a bid that is bound to lose.
Keep track of new lots. According to TenderLabs data, 10,282 new procurements appeared last week alone, and 12,587 the week before. The flow is large, and without a filter it is easy to drown. Set up notifications by your keywords in TenderLabs to see suitable tenders and check requirements in advance. That way you will submit bids consciously, not on the last day.

